Glanmire Solar Farm

Project Overview

Glanmire Solar Farm is proposed to have a capacity of approximately 60 megawatts (MW)(AC). The project will comprise ground mounted solar photovoltaic (PV) modules (panels) similar to those installed on rooftops around Australia.

Glanmire Solar Farm is proposed on a site at 4823 Great Western Highway, Glanmire, NSW 2795. This site is located approximately 11km east of the township of Bathurst and approximately 4.5km east of Raglan.

The project will cover a development footprint of approximately 186 hectares. The land is currently used for grazing with a small area used for intermittent cropping. It is intended that sheep grazing will continue within the development footprint of the project once operational.

 

Why was this site chosen?

  • High solar irradiance
  • Cost-effective grid connection with capacity
  • Relatively flat and clear land with few environmental constraints
  • Not identified as highest quality agricultural land or ‘Biophysical Strategic Agricultural Land’

Key Project Details

  • Location: 11km east of Bathurst township
  • Project size: ~ 60MW (AC)
  • Site area: 186 hectares
  • Grid connection: 66kV line
  • Construction duration: ~ 12 months
  • Grazing: Sheep will graze the site once operational

Project Booklet


To learn more about the proposed Glanmire Solar Farm, please download the project information leaflet.